Remember when I lamented on how the last 10% of a project is the hardest back in November 2014? That was easily over a year ago now and I thought I’d strengthen my argument by sharing how few of those items we’ve completed.

  • Basement: Black cabinet piece on top cabinets
  • Basement: Decor
    Done, as of last weekend.
  • Basement: Blinds
    Done, this was actually done in conjunction with the office blinds.
  • Basement: Small piece of baseboard around bar
  • Crown molding in front bedroom
  • Lampshades in master bedroom
    Done.
  • Fascia on deck
  • Alaska scrapbook from 2013
    Done, along with the Alaska 2009 scrapbook. Next up is our California trip from 2014.

2 thoughts on “90% Update”

Comments are closed.